In 1996, a full-scale geotextile-reinforced soil (GRS) bridge abutment and two bridge piers with block facing were constructed in the Havana Maintenance Yard in Denver, Colorado. The abutment and outer GRS pier were load tested to demonstrate that GRS abutments and piers with block facing are viable alternatives to conventional bridge piers and abutments. Four to six months after the surcharge load was placed, excessive movements of the top several layers of the outer pier structure and severe cracking of the block facing were noticed. The toppling failure of the upper four block layers of the outer pier was deemed imminent and, consequently, the structures were dismantled. This report summarizes the measured in-situ conditions and characteristics of the structures' materials (backfill, blocks, and geotextile fabric) after almost three years of being in place and identifies potentially relevant causes for the excessive deformation and cracking of the outer pier structure.