~ tracking down this book ~
These guidelines include ASCE/EWRI standards 45-05 (design), 46-05 (installation) and 47-05 (operation and maintenance) of urban storm water systems. The design guidelines cover site analysis, hydrology, nonstructural considerations such as flood plains and wetlands, system configuration, hydraulic design, structural design, materials, regulations and permits and applicable documentation. The installation standards cover contacts, pre-construction site inspection, construction and inspection, and those for operation and maintenance including planning, water quality, periodic inspection and maintenance procedures. Annotation ©2006 Book News, Inc. , Portland, OR (booknews. com)